10-year implementation plan
Project Road / Path Suburb Start Point End Point Length Works summary Year 6 Year 7 Year 8 Year 9 Year 10 Total
ID Description (m)
Northbound on-road lane
163 Eumundi Noosa Road Noosaville Eenie Creek Road Walter Hay Drive 440 $530,000 $530,000
widened to 1.5m
293 Sunshine Beach Road Noosa Heads Noosa Drive Cooyar Street 564 New 3m separated cycle path $215,000 E $215,000 E
Lions Park Noosa Heads
269 Noosa Heads Lions Car Park Sunshine Beach Road 1,002 ~4.5m elevated shared path $2,437,500 E $2,437,500 E $4,875,000 E
link
East side of Garth Prowd Upgrade on-road 1.5m lane
257 Noosa Parade Noosa Heads Lions Car Park access 221 $287,000 E $287,000 E
Bridge Upgraded 3m shared path
Noosa Drive/ Noosa Upgraded 3m shared path,
259 Noosa Heads Lions Car Park access Hastings Street 267 $525,000 E $525,000 C
Parade precinct improved crossing facilities
153 Rene Street Noosaville No. 68 Rene Street No. 100 Rene Street 268 New 2m shared path $175,000 $175,000
154 Rene Street Noosaville Eumundi Noosa Road Production Street 931 New on-road 1.5m lane $105,000 $105,000
Hinterland and local links (low cost, high impact) $1,250,000
187 Butler Street Tewantin Crank Street 110m north of Crank Street 116 New 2m shared path
244B Thomas Street Noosaville Mary Street Gibson Road 100 New 2.5m shared path
387 Carruthers Park Cooroy Carruthers St Blue Wren Place 140 New 2m shared path $250,000
Misc Unallocated hinterland
and local links
LC11 McKinnon Drive link Tewantin McKinnon Drive Dilgar Place cul-de-sac 160 New 2m shared path
LC13 Leslie Drive Service Road Noosa Heads 29 Leslie Drive 70m South of Leslie Drive 82 New 1.5m shared path
intersection $250,000
LC15 Peregian Trail connector Peregian Beach Peregian Breeze Drive Woodland Drive 1325 New trail
LC19 Nancy Cato Park link Noosaville Bust Stop: 301764 Dolphin Crescent 61 New 2.5m shared path
LC10 Lewis Street link Noosaville Existing pathway on Lewis Existing pathway on 122 New 1.5m shared path
Street McKenna Court
LC18 Seaview link Sunshine Beach 26 Seaview Terrace Arakoon Crescent 74 Upgraded track $250,000
Misc Unallocated hinterland
and local links
Unallocated hinterland and local links (low Shire wide - - - - $250,000 $250,000
cost, high impact projects)
Existing way-finding, mid-trip (Including
tree planting for shade) and end-of-trip Shire wide - - - - $20,000 $20,000 $20,000 $20,000 $20,000 $100,000
facility improvements
Total 4,324 $1,015,000 $2,707,500 $2,707,500 $1,082,000 $550,000 $8,062,000
Table 15: Noosa bike riding and walking network | 10-year implementation plan*
A. Funded by Noosa Council and the Federal Government under the Bridges Renewal Program.
B. Council and TMR co-funded project (50-50) under the Cycle Network Local Government Grants Program.
C. Funded through TMR's Road Stimulus Package.
D. Funded through Council's Hinterland Playground Project
E. May be eligible for grants from the State Government covering up to 50% of project costs.