Page 43 - Final Noosa Cycling and Walking Strategy and Implementation Plan 2020 - 2040
P. 43

Project   Road / Path   Suburb  Start Point  End Point  Length   Works summary  Year 6  Year 7  Year 8  Year 9  Year 10  Total
 ID  Description  (m)

         Northbound on-road lane
 163  Eumundi Noosa Road  Noosaville  Eenie Creek Road  Walter Hay Drive  440  $530,000               $530,000
            widened to 1.5m
 293  Sunshine Beach Road  Noosa Heads  Noosa Drive  Cooyar Street  564  New 3m separated cycle path  $215,000 E  $215,000 E
 Lions Park Noosa Heads
 269  Noosa Heads  Lions Car Park  Sunshine Beach Road  1,002  ~4.5m elevated shared path  $2,437,500 E  $2,437,500 E  $4,875,000 E
 link
 East side of Garth Prowd   Upgrade on-road 1.5m lane
 257  Noosa Parade  Noosa Heads  Lions Car Park access  221               $287,000 E                 $287,000 E
 Bridge  Upgraded 3m shared path
 Noosa Drive/ Noosa   Upgraded 3m shared path,
 259  Noosa Heads  Lions Car Park access  Hastings Street  267            $525,000 E                 $525,000 C
 Parade precinct  improved crossing facilities
 153  Rene Street  Noosaville  No. 68 Rene Street  No. 100 Rene Street  268  New 2m shared path  $175,000  $175,000
 154  Rene Street  Noosaville  Eumundi Noosa Road  Production Street  931  New on-road 1.5m lane  $105,000  $105,000

 Hinterland and local links (low cost, high impact)                                                  $1,250,000
 187   Butler Street   Tewantin   Crank Street   110m north of Crank Street   116   New 2m shared path
 244B   Thomas Street   Noosaville   Mary Street   Gibson Road   100   New 2.5m shared path
 387   Carruthers Park   Cooroy  Carruthers St  Blue Wren Place  140  New 2m shared path  $250,000
 Misc  Unallocated hinterland
 and local links
 LC11   McKinnon Drive link   Tewantin   McKinnon Drive   Dilgar Place cul-de-sac   160   New 2m shared path
 LC13   Leslie Drive Service Road   Noosa Heads   29 Leslie Drive   70m South of Leslie Drive   82   New 1.5m shared path
             intersection                       $250,000
 LC15   Peregian Trail connector   Peregian Beach   Peregian Breeze Drive   Woodland Drive   1325   New trail
 LC19  Nancy Cato Park link  Noosaville  Bust Stop: 301764  Dolphin Crescent  61  New 2.5m shared path

 LC10   Lewis Street link   Noosaville   Existing pathway on Lewis   Existing pathway on   122   New 1.5m shared path
          Street   McKenna Court
 LC18   Seaview link   Sunshine Beach  26 Seaview Terrace  Arakoon Crescent  74  Upgraded track  $250,000
 Misc  Unallocated hinterland
 and local links
 Unallocated hinterland and local links (low   Shire wide  -  -  -  -     $250,000     $250,000
 cost, high impact projects)

 Existing way-finding, mid-trip (Including
 tree planting for shade) and end-of-trip   Shire wide  -  -  -  -  $20,000  $20,000  $20,000  $20,000  $20,000  $100,000
 facility improvements
 Total  4,324                    $1,015,000   $2,707,500   $2,707,500   $1,082,000    $550,000       $8,062,000
                                 *This draft implementation plan is subject to change as a result of grant
                                      allocations, council budget processes and emergent works.
 A. Funded by Noosa Council and the Federal Government under the Bridges Renewal Program.
 B. Council and TMR co-funded project (50-50) under the Cycle Network Local Government Grants Program.
 C. Funded through TMR's Road Stimulus Package.
 D. Funded through Council's Hinterland Playground Project
 E. May be eligible for grants from the State Government covering up to 50% of project costs.














                                                                                Noosa Cycling and Walking Strategy 2020 | Page 43