Page 19 - Final Noosa Cycling and Walking Strategy and Implementation Plan 2020 - 2040
P. 19
Existing bike riding and walking infrastructure
We want to build on our existing bike riding and walking paths to create a
connected and safe network.
240km
of sealed pathways
153km dedicated on-road
cycle routes
Most of the existing network is in the urbanised coastal
area. Our hinterland network is predominantly located in
and around the townships.
160km
of recreational trails
Walking and riding trails are provided for users of
all abilities and vary from a 1km easy walk/ride,
to a 62km circuit which includes a 22km long
section of steep climbs and descents.
914m Off-road
recreational
criterium cycling track
facilities
The dedicated cycling track provides Including a BMX track at Cooroy, Persimmon
users with safe recreation and training
opportunities at the Girraween Sports Park, Peregian Beach, Sunshine Beach and
Tewantin skateparks, and Wooroi mountain
Complex in Noosa Heads.
bike trails.
Existing walking paths Existing cycling routes
<1.2m 1.2m to >2.5m >2.5m wide Informal Formal
wide 2.5m wide wide shared path on-road cycle
provisions lanes
32% 49% 19% 32% 49% 19%
19